Some of you were wondering about the shop progress. I've been welding in there lately, all mig work to date. Been helping my buddies out with projects for brewing and sterilizing systems for farms. Next step I'll be cutting in a regular steel door on the far side of the concrete slab which was finally poured just before the holidays after all was cleared with the county...took forever. Anyhow.
So welding in a frame for the door and then installing that. Also, a window for some light and, of course, a window a/c unit as it's S. FL and I'd like to not die in there during the warmer months. I think though with a couple of fans running it should be very cool though.
Once the door and window are in I'm building a frame over the length of the concrete slab and installing a clear plastic roof to let the light in. Then the Stave Master and outdoor bench, etc. will go under that.
Finally will come the mini-bar, wireless tv, shrunken heads on sticks and hula-dancers. Eventually it might be kinda fun to build a deck on top and make a stairway behind it. It's nice up there and private as its surrounded by trees for the most part.
Enjoy, guys. Let me know if you have any questions.